---
title: "Haul-Out and Launch Calendar for Canadian Boaters, by Region"
description: "When boats come out and go back in across Canada: launch and haul-out months by region, lock season dates for the Trent-Severn and Rideau, and when to book."
url: https://boatparking.ca/guides/haul-out-and-launch-calendar/
last_updated: 2026-10-23
---

# Haul-out and launch calendar

From Lake Ontario to the Okanagan, the boating year is set by ice, locks and the weather. These are the typical windows. Each yard publishes its own dates.

## Boating season by region

- [Toronto Waterfront](https://boatparking.ca/locations/toronto-waterfront/): Launch April to May; haul-out October.
- [Mississauga and Oakville Waterfront](https://boatparking.ca/locations/mississauga-oakville/): Launch April to May; haul-out October.
- [Hamilton and Burlington](https://boatparking.ca/locations/hamilton-burlington/): Launch April to May; haul-out October.
- [Niagara and Lake Erie](https://boatparking.ca/locations/niagara-lake-erie/): Launch April to May; haul-out October.
- [Lake Simcoe and Couchiching](https://boatparking.ca/locations/lake-simcoe/): Launch May; haul-out October.
- [Muskoka Lakes](https://boatparking.ca/locations/muskoka/): Launch May; haul-out September to October.
- [Georgian Bay](https://boatparking.ca/locations/georgian-bay/): Launch May; haul-out September to October.
- [Kawarthas and Trent-Severn Waterway](https://boatparking.ca/locations/kawarthas-trent-severn/): Launch May; haul-out October.
- [Kingston and Thousand Islands](https://boatparking.ca/locations/kingston-thousand-islands/): Launch April to May; haul-out October.
- [Ottawa River and Rideau Canal](https://boatparking.ca/locations/ottawa-rideau/): Launch May; haul-out October.
- [Bay of Quinte and Prince Edward County](https://boatparking.ca/locations/bay-of-quinte-prince-edward-county/): Launch May; haul-out October.
- [Montreal and Lac Saint-Louis](https://boatparking.ca/locations/montreal-lac-saint-louis/): Launch May; haul-out October to November.
- [Richelieu River and Lake Champlain (north end)](https://boatparking.ca/locations/richelieu-lake-champlain/): Launch May; haul-out October.
- [Eastern Townships (Lac Memphrémagog and area lakes)](https://boatparking.ca/locations/eastern-townships/): Launch May; haul-out October.
- [Quebec City and the St. Lawrence](https://boatparking.ca/locations/quebec-city/): Launch May; haul-out October.
- [Vancouver and the Lower Mainland](https://boatparking.ca/locations/vancouver-lower-mainland/): Boats stay in the water year-round in many marinas; haul-outs for those who store ashore run October to November.
- [Vancouver Island](https://boatparking.ca/locations/vancouver-island/): Boats stay in the water year-round in many marinas; haul-outs for those who store ashore run October to November.
- [Okanagan](https://boatparking.ca/locations/okanagan/): Launch April to May; haul-out October.
- [Calgary and area](https://boatparking.ca/locations/calgary/): Launch May; haul-out October.
- [Edmonton and Central Alberta lakes](https://boatparking.ca/locations/edmonton-central-alberta/): Launch May; haul-out September to October.
- [Winnipeg, Lake Winnipeg and Lake of the Woods](https://boatparking.ca/locations/winnipeg-lake-winnipeg/): Launch May; haul-out September to October.
- [Halifax and the South Shore](https://boatparking.ca/locations/halifax-south-shore/): Launch May to June; haul-out October to November.
- [New Brunswick (Saint John River, Kennebecasis and Shediac)](https://boatparking.ca/locations/new-brunswick/): Launch May to June; haul-out October.

Typical months from public sources. Ice-out varies by year.

## Fixed dates worth knowing

- The Trent-Severn Waterway and Rideau Canal lock season ran May 15 to October 12 (Thanksgiving) in 2026. (source: https://parks.canada.ca/lhn-nhs/on/trentsevern/visit/heures-hours)
- The Welland Canal pleasure craft season ran May 1 to October 25 in 2026. (source: https://greatlakes-seaway.com/en/pleasure-craft/)
- The Burlington Canal Lift Bridge does not lift during the winter months, January to late March. (source: https://en.wikipedia.org/wiki/Burlington_Canal_Lift_Bridge)
- Glenmore Reservoir boating in Calgary runs May 1 to October 31. (source: https://www.calgary.ca/rec-locations/sailing-school/rules.html)

## When to book

- Winter storage: July to September. Popular yards near Toronto and in cottage country fill by early fall.
- Spring work: January to March, before technicians are booked solid.
- Seasonal slips: Winter, or join the waitlist a year ahead for busy marinas and the BC coast.

## Related

- [Winter boat storage](https://boatparking.ca/storage/winter-boat-storage/)
- [Haul-out and launch](https://boatparking.ca/services/haul-out-and-launch/)
- [Where boats winter in Canada](https://boatparking.ca/locations/)

---

Find a spot: https://boatparking.ca/request-a-spot/ · Email: info@boatparking.ca
